Inside Maze

maze

Thinking Big on your event to amaze your guest

Tensioned Tent TK2

Creating Your Event Maze

With these tents, you are able  to arrange them in such a way to form a larger tent when needed without investing in a large and expensive big tent. You will have to use rain gutters between the connection.

Cover Material:

Option 1

Base Fabric

Yarn

Weight

Thickness

Features

Colour

Printing

: PVC Laminated Polyester Textile

: 250 Denier

: 440gsm

: 0.38mm

: UV Treated

: Optional

: Up to 1400dpi

Option 2

Base Fabric

Yarn

Weight

Thickness

Fire Retardant

Features

Colour

Printing

: PVC Laminated Polyester Textile

: 1000 Denier

: 530gsm

: 0.42mm

: DIN 4102 B1

: Both sides acrylic coating, UV Treated,  

  Anti-mould & Mildew, Anti-Fungus

: Optional

: Up to 1400dpi

Product Specification:

Main Beam Profile

Main Column Profile

Framework Material

: 38mm x 75mm x 1.6mm

: 50mm x 50mm 1.6mm x 1800mm

: Hot-dipped galvanised steel

Design Wind Speed:

Speed

: 80km/h 

Application & Inspiration

festool-3_s-800x500.jpg
warehouse.png
GettyImages-916117514.jpg
Screenshot 2021-04-06 at 5.01.21 PM.png
dede.jpg
47d6a6_c39ae01378d64df9bffe488cc99d46ac~
47d6a6_4d01bff65b9547738bac21da3151c3f8~
istockphoto-486993238-612x612.jpg
Garden Party
Fairytale Wedding

Project Photo

Specification

3x3m.png

3m x 3m 

Size: 3m x 3m

Size & Weight

Floor Area : 9sqm (96.9sqft)

Center Height : 3.5m - 4.7m

Approx. Frame Weight : 113.7kg

Capacity

Standing : ? pax

Sitting: ? pax

Round tables : ? pax

Engineering

Max. wind load : 80km/h

Assembly

Assembly Time : 45 minutes (5 crews)

From:

RM1,920

6x6m.png

6m x 6m

Size: 6m x 6m

Size & Weight

Floor Area : 36sqm (387.5sqft)

Center Height : 4.2m - 5.4m

Approx. Frame Weight : 154.8kg

Capacity

Standing : ? pax

Sitting: ? pax

Round tables : ? pax

Engineering

Max. wind load : 80km/h

Assembly

Assembly Time : 45 minutes (5 crews)

From:

RM3,030

3x6m.png

3m x 6m

Size: 3m x 6m

Size & Weight

Floor Area : 18sqm (193.75sqft)

Center Height : 4.2m - 5.4m

Approx. Frame Weight : 129.4kg

Capacity

Standing : ? pax

Sitting: ? pax

Round tables : ? pax

Engineering

Max. wind load : 80km/h

Assembly

Assembly Time : 45 minutes (5 crews)

From:

RM2,470

6x9m.png

6mx 9m

Size: 6m x 9m

Size & Weight

Floor Area : 54sqm (581.25sqft)

Center Height : 4.7m - 5.9m

Approx. Frame Weight : 192kg

Capacity

Standing : ? pax

Sitting: ? pax

Round tables : ? pax

Engineering

Max. wind load : 80km/h

Assembly

Assembly Time : 45 minutes (5 crews)

From:

RM4,600

5x6m.png

5m x 6m

Size: 5m x 6m

Size & Weight

Floor Area : 30sqm (322.9sqft)

Center Height : 4.3m - 5.5m

Approx. Frame Weight : 147kg

Capacity

Standing : ? pax

Sitting: ? pax

Round tables : ? pax

Engineering

Max. wind load : 80km/h

Assembly

Assembly Time : 45 minutes (5 crews)

From:

RM2,860

Optional Accessories & Services

Platform.jpg
Side Wall.png
Screen Printing Materials